Amended
IN
Senate
June 27, 2021 |
Amended
IN
Assembly
February 18, 2021 |
Introduced by Committee on Budget (Assembly Members Ting (Chair), Arambula, Bennett, Bloom, Carrillo, Chiu, Cooper, Frazier, Friedman, Cristina Garcia, Jones-Sawyer, Lee, McCarty, Medina, Mullin, Nazarian, O’Donnell, Ramos, Reyes, Luz Rivas, Blanca Rubio, Stone, and Wood) |
January 08, 2021 |
This bill would express the intent of the Legislature to enact statutory changes, relating to the Budget Act of 2021.
Any
Jurisdiction | Amount |
Alameda
........................
| $12.00 |
Alpine
........................
| 1.00 |
Amador
........................
| 6.00 |
Butte
........................
| 12.00 |
Calaveras
........................
| 7.00 |
Colusa
........................
| 12.00 |
Contra Costa
........................
| 8.00 |
Del Norte
........................
| 6.00 |
El Dorado
........................
| 9.00 |
Fresno
........................
| 9.00 |
Glenn
........................
| 6.00 |
Humboldt
........................
| 12.00 |
Imperial
........................
| 12.00 |
Inyo
........................
| 6.00 |
Kern
........................
| 12.00 |
Kings
........................
| 12.00 |
Lake
........................
| 12.00 |
Lassen
........................
| 12.00 |
Los Angeles
........................
| 5.00 |
Madera
........................
| 12.00 |
Marin
........................
| 12.00 |
Mariposa
........................
| 4.00 |
Mendocino
........................
| 12.00 |
Merced
........................
| 12.00 |
Modoc
........................
| 6.00 |
Mono
........................
| 6.00 |
Monterey
........................
| 10.00 |
Napa
........................
| 12.00 |
Nevada
........................
| 7.00 |
Orange
........................
| 8.00 |
Placer
........................
| 7.00 |
Plumas
........................
| 6.00 |
Riverside
........................
| 12.00 |
Sacramento
........................
| 8.50 |
San Benito
........................
| 6.00 |
San Bernardino
........................
| 12.00 |
San Diego
........................
| 12.00 |
San Francisco
........................
| 12.00 |
San Joaquin
........................
| 10.00 |
San Luis Obispo
........................
| 12.00 |
San Mateo
........................
| 12.00 |
Santa Barbara
........................
| 12.00 |
Santa Clara
........................
| 8.00 |
Santa Cruz
........................
| 12.00 |
Shasta
........................
| 8.50 |
Sierra
........................
| 9.00 |
Siskiyou
........................
| 8.00 |
Solano
........................
| 9.00 |
Sonoma
........................
| 12.00 |
Stanislaus
........................
| 6.50 |
Sutter
........................
| 1.00 |
Tehama
........................
| 9.00 |
Trinity
........................
| 6.00 |
Tulare
........................
| 12.00 |
Tuolumne
........................
| 2.00 |
Ventura
........................
| 12.00 |
Yolo
........................
| 10.00 |
Yuba
........................
| 7.00 |
(f)This section shall become operative on July 1, 2013.
(2)To the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5, thirty dollars ($30), unless the fee is collected under Section 70658, in which case the amount distributed to that fund shall be one hundred seventy dollars ($170).
(3)
(4)
(5)
(2)To the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5, twenty-five dollars ($25) if the fee is three hundred thirty dollars ($330), and twenty dollars ($20) if the fee is two hundred five dollars ($205), except as otherwise provided in Section 6322.1 of the Business and Professions Code.
(3)
(4)
(5)
(2)The Immediate and Critical
Needs Account of the State Court Facilities Construction Fund.
(3)
(a)There is hereby established the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, the proceeds of which shall only be used for any of the following:
(1)The planning, design, construction, rehabilitation, renovation, replacement, or acquisition of court facilities.
(2)Repayment for moneys appropriated for lease of court facilities pursuant to the issuance of lease-revenue bonds.
(3)Payment for lease or rental of court facilities or payment of service contracts, including those made for facilities in which one or more private sector participants
undertake some of the risks associated with the financing, design, construction, or operation of the facility.
(4)For trial court operations, as defined in Section 77003.
(b)Any funds expended from the Immediate and Critical Needs Account are not subject to Section 77202.
(c)Notwithstanding Section 13340, until July 1, 2012, the Immediate and Critical Needs Account is hereby continuously appropriated, without regard to fiscal year, only for the purposes of acquiring real property and completing preliminary plans.
(d)It is the intent of the Legislature that the money in the Immediate and Critical Needs Account shall be used in part to pay the debt service of lease revenue bonds, notes, bond anticipation notes, or other appropriate financial
instruments used to pay for the costs referred to in subdivision (a) in the amount of up to five billion dollars ($5,000,000,000). The total bonded indebtedness shall not exceed that amount for which fine and fee revenues may fully satisfy the debt service.
(e)The Judicial Council shall collect and make available upon request information regarding the moneys deposited in the Immediate and Critical Needs Account resulting from new and increased fees, assessments, and penalties authorized by the act that added this section.
(f)(1)The Judicial Council shall make recommendations to the State Public Works Board before it undertakes projects based on its determination that the need for a project is most immediate and critical using the then most recent version of the Prioritization Methodology for Trial Court Capital-Outlay Projects originally adopted on August
26, 2006, subject to the availability of funds in the Immediate and Critical Needs Account. Any such recommendation shall be accompanied by a certification that there are sufficient funds in the Immediate and Critical Needs Account. The State Public Works Board shall establish the scope and cost for each individual project.
(2)The Legislature finds that there may not be enough resources to pay for the cost of the projects identified as immediate and critical needs by the Judicial Council pursuant to its Prioritization Methodology for Trial Court Capital-Outlay Projects originally adopted on August 26, 2006, even after considering any bonded indebtedness that may be issued relying at least in part on those resources. Therefore, in choosing which projects shall be recommended to the State Public Works Board to be funded from the Immediate and Critical Needs Account, the Judicial Council shall consider and apply, as appropriate, the following
factors, among others:
(A)Any economic opportunity that exists for a project.
(B)The effect on available resources of using alternative methods of project delivery as provided by Section 70391.5.
(3)Nothing in paragraph (2) shall authorize the Judicial Council to exceed the resources provided by the Immediate and Critical Needs Account, together with other available resources, in undertaking projects identified as immediate and critical needs.
(4)As used in paragraph (2), “economic opportunity” includes, but is not limited to, free or reduced costs of land for new construction, viable financing partnerships with, or fund contributions by, other government entities or private parties that result in lower project delivery costs, cost savings resulting
from adaptive reuse of existing facilities, operational efficiencies from consolidation of court calendars and operations, operational savings from sharing of facilities by more than one court, and building operational cost savings from consolidation of facilities.
(5)The Judicial Council shall not consider and apply an economic opportunity unless it is reasonably assured that the economic opportunity is viable and will be realized. If a project is selected for funding based on an economic opportunity that is withdrawn after the project is approved, the Judicial Council may cancel the project.
(g)Notwithstanding any law, the Controller may use the funds in the Immediate and Critical Needs Account of the State Court Facilities Construction Fund for cashflow loans to the General Fund as provided in Sections 16310 and 16381.
The Judicial Council shall report to the Joint Legislative Budget Committee and chairs of the Senate Committee on Budget and Fiscal Review and the Assembly Committee on Budget by March 1 of each year on the status of each project established by the State Public Works Board under Section 70371.7. The report shall also include an accounting of the revenues generated and expenditures made in the Immediate and Critical Needs Account.
(A)The total to be deposited pursuant to subdivision (a) shall be multiplied by a fraction as follows:
(i)The numerator is the amount imposed as of January 1, 1998, as an additional penalty on every ten dollars ($10), or part of ten dollars ($10), upon every fine, penalty, or forfeiture, if any, for
deposit into the local courthouse construction fund in that county established pursuant to Sections 76000 and 76100. The numerator shall be expressed in whole dollars and fractions of a dollar.
(ii)The denominator is five dollars ($5).
(B)The resulting amount shall be deposited in the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5.
(C)The remaining amount of the deposit shall be deposited in the State Court Facilities Construction Fund.
(2)Within 45 days after the end of the month that moneys are deposited in the county treasury pursuant to subdivision (b), the county treasurer shall transmit the moneys to the Controller to be deposited as follows: one-third of the total amount
shall be deposited in the State Court Facilities Construction Fund and two-thirds of the total amount shall be deposited in the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5.
(d)(1)Except as provided in Section 70374.2 and paragraph (2) of this subdivision, 25 percent of all moneys collected for the State Court Facilities Construction Fund from any county shall be designated for implementation of trial court projects in that county. The Judicial Council shall determine the local projects after consulting with the trial court in that county and based on the locally approved trial court facilities master plan for that county.
(2)Paragraph (1) shall not apply to moneys that have been deposited in the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5.
(e)
(a)For purposes of this section, the definitions in subdivision (a) of Section 13332.19 shall apply. For purposes of subdivision (a) of Section 13332.19, references to the Department of General Services shall be deemed to be references to the Judicial Council.
(b)Notwithstanding any provision of the Public Contract Code or any other law, when the Legislature appropriates funds for a specific project, the Judicial Council may contract and procure court facilities pursuant to this section.
(c)Prior to contracting with a design-build entity for the procurement of a court facility under this section, the Judicial Council shall:
(1)Prepare a program setting forth the performance criteria for the design-build project. The performance criteria shall be prepared by a design professional duly licensed and registered in the State of California.
(2)(A)Establish a competitive prequalification and selection process for design-build entities, including any subcontractors listed at the time of bid, that clearly specifies the prequalification criteria, and states the manner in which the winning design-build entity will be selected.
(B)Prequalification shall be limited to consideration of all of the following criteria:
(i)Possession of all required licenses, registration, and credentials in good standing that are required to design and construct the project.
(ii)Submission of evidence that establishes that the design-build entity members have completed, or demonstrated the capability to complete, projects of similar size, scope, or complexity, and that proposed key personnel have sufficient experience and training to competently manage and complete the design and construction of the project.
(iii)Submission of a proposed project management plan that establishes that the design-build entity has the experience, competence, and capacity needed to effectively complete the project.
(iv)Submission of evidence that establishes that the design-build entity has the capacity to obtain all required payment and performance bonding, liability insurance, and errors and omissions insurance, as well as a financial statement that assures the Judicial Council that the design-build entity has the capacity to complete the project.
(v)Provision of a declaration certifying that applying members of the design-build entity have not had a surety company finish work on any project within the last five years.
(vi)Provision of information and a declaration providing detail concerning all of the following:
(I)Any construction or design claim or litigation totaling more than five hundred thousand dollars ($500,000) or 5 percent of the annual value of work performed, whichever is less, settled against any member of the design-build entity over the last five years.
(II)Serious violations of the California Occupational Safety and Health Act of 1973, as provided in Part 1 (commencing with Section 6300) of Division 5 of the Labor Code, settled against any member of the design-build entity.
(III)Violations of federal or state law, including, but not limited to, those laws governing the payment of wages, benefits, or personal income tax withholding, or of Federal Insurance Contributions Act (FICA) withholding requirements, state disability insurance withholding, or unemployment insurance payment requirements, settled against any member of the design-build entity over the last five years. For purposes of this subclause, only violations by a design-build member as an employer shall be deemed applicable, unless it is shown that the design-build entity member, in his or her capacity as an employer, had knowledge of his or her subcontractor’s violations or failed to comply with the conditions set forth in subdivision (b) of Section 1775 of the Labor Code.
(IV)Information required by Section 10162 of the Public Contract Code.
(V)Violations of the Contractors’ State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code), excluding alleged violations or complaints.
(VI)Any conviction of any member of the design-build entity of submitting a false or fraudulent claim to a public agency over the last five years.
(vii)Provision of a declaration that the design-build entity will comply with all other provisions of law applicable to the project, including, but not limited to, the requirements of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(C)The Judicial Council, when requested by the design-build entity, shall hold in confidence any information required by clauses (i) to (vi), inclusive, of subparagraph (B).
(D)Any declaration required under subparagraph (B) shall state that reasonable diligence has been used in its preparation and that it is true and complete to the best of the signer’s knowledge. A person who certifies as true any material matter that he or she knows to be false is guilty of a misdemeanor and shall be punished by not more than one year in a county jail, by a fine of not more than five thousand dollars ($5,000), or by both the fine and imprisonment.
(3)(A)Determine, as the Judicial Council deems in the best interests of the state, which of the following methods listed in subparagraph (B) will be used as the process for the winning design-build entity. The Judicial Council shall provide a notification to the State Public Works Board, regarding the method selected for determining the winning design-build entity, at least 30 days prior to publicizing the design-build solicitation package.
(B)The Judicial Council shall make its determination by choosing one of the following methods:
(i)A design-build competition based upon performance, price, and other criteria set forth by the Judicial Council in the design-build solicitation package. The Judicial Council shall establish technical criteria and methodology, including price, to evaluate proposals and shall describe the criteria and methodology in the design-build solicitation package. Award shall be made to the design-build entity whose proposal is judged as providing the best value in meeting the interests of the Judicial Council and meeting the objectives of the project. A project with an approved budget of ten million dollars ($10,000,000) or more may be awarded pursuant to this clause.
(ii)A design-build competition based upon performance and other criteria set forth by the Judicial Council in the design-build solicitation package. Criteria used in this evaluation of proposals may include, but need not be limited to, items such as proposed design approach, life-cycle costs, project features, and functions. However, any criteria and methods used to evaluate proposals shall be limited to those contained in the design-build solicitation package. Award shall be made to the design-build entity whose proposal is judged as providing the best value, for the lowest price, meeting the interests of the Judicial Council and meeting the objectives of the project. A project with an approved budget of ten million dollars ($10,000,000) or more may be awarded pursuant to this clause.
(iii)A design-build competition based upon program requirements and a detailed scope of work, including any performance criteria and concept drawings set forth by the Judicial Council in the design-build solicitation package. Award shall be made on the basis of the lowest responsible bid. A project with an approved budget of two hundred fifty thousand dollars ($250,000) or more may be awarded pursuant to this clause.
(4)For purposes of this subdivision, the following definitions shall apply:
(A)“Best interest of the state” means a design-build process that is projected by the Judicial Council to reduce the project delivery schedule and total cost of a project while maintaining a high level of quality workmanship and materials, when compared to the traditional design-bid-build process.
(B)“Best value” means a value determined by objective criteria that may include, but are not limited to, price, features, functions, life-cycle costs, experience, and other criteria deemed appropriate by the Judicial Council.
(d)The Legislature recognizes that the design-build entity is charged with performing both design and construction. Because a design-build contract may be awarded prior to the completion of the design, it is often impracticable for the design-build entity to list all subcontractors at the time of the award. As a result, the subcontractor listing requirements contained in Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code can create a conflict with the implementation of the design-build process by requiring all subcontractors to be listed at a time when a sufficient set of plans may not be available. It is the intent of the Legislature to establish a clear process for the selection and award of subcontracts entered into pursuant to this section in a manner that retains protection for subcontractors while enabling design-build projects to be administered in an efficient fashion. Therefore, all of the following requirements shall apply to subcontractors, licensed pursuant to Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, that are employed on design-build projects undertaken pursuant to this section:
(1)The Judicial Council, in each design-build solicitation package, may identify types of subcontractors, by subcontractor license classification, that will be listed by the design-build entity at the time of the bid. In selecting the subcontractors that will be listed by the design-build entity, the Judicial Council shall limit the identification to only those license classifications deemed essential for proper completion of the project. In no event, however, may the Judicial Council specify more than five licensed subcontractor classifications. In addition, at its discretion, the design-build entity may list an additional two subcontractors, identified by subcontractor license classification, that will perform design or construction work, or both, on the project. In no event shall the design-build entity list at the time of bid a total number of subcontractors that will perform design or construction work, or both, in a total of more than seven subcontractor license classifications on a project. All subcontractors that are listed at the time of bid shall be afforded all of the protection contained in Chapter 4 (commencing with Section 4100) of Part 1 of Division 2 of the Public Contract Code. All subcontracts that were not listed by the design-build entity at the time of bid shall be awarded in accordance with paragraph (2).
(2)All subcontracts that were not to be performed by the design-build entity in accordance with paragraph (1) shall be competitively bid and awarded by the design-build entity, in accordance with the design-build process set forth by the Judicial Council in the design-build solicitation package. The design-build entity shall do all of the following:
(A)Provide public notice of the availability of work to be subcontracted in accordance with Section 10140 of the Public Contract Code.
(B)Provide a fixed date and time on which the subcontracted work will be awarded in accordance with Section 10141 of the Public Contract Code.
(C)As authorized by the Judicial Council, establish reasonable prequalification criteria and standards, limited in scope to those detailed in paragraph (2) of subdivision (c).
(D)Provide that the subcontracted work shall be awarded to the lowest responsible bidder.
(e)This section shall not be construed and is not intended to extend or limit the authority specified in Section 19130.
(f)Any design-build entity that is selected to design and construct a project pursuant to this section shall possess or obtain sufficient bonding consistent with applicable provisions of the Public Contract Code. Nothing in this section shall prohibit a general or engineering contractor from being designated the lead entity on a design-build entity for the purposes of purchasing necessary bonding to cover the activities of the design-build entity.
(g)Any payment or performance bond written for the purposes of this section shall use a bond form developed by the Judicial Council. In developing the bond form, the Judicial Council shall consult with the surety industry to achieve a bond form that is consistent with surety industry standards, while protecting the interests of the state.
(h)The Judicial Council shall submit to the Joint Legislative Budget Committee, before January 1, 2014, a report containing a description of each public works project procured through the design-build process described in this section that is completed after January 1, 2009, and before December 1, 2013. The report shall include, but shall not be limited to, all of the following information:
(1)The type of project.
(2)The gross square footage of the project.
(3)The design-build entity that was awarded the project.
(4)The estimated and actual project costs.
(5)An assessment of the prequalification process and criteria.
(6)An assessment of the effect of any retention on the project made under the law.
(7)A description of the method used to award the contract. If the best value method was used, the report shall describe the factors used to evaluate the bid, including the weighting of each factor and an assessment of the effectiveness of the methodology.
(i)The authority under this section and Section 14661.1 shall apply to a total of not more than five state office facilities, prison facilities, or court facilities, which shall be determined pursuant to this subdivision.
(1)In order to enter into a contract utilizing the procurement method authorized under this section, the Judicial Council shall submit a request to the Department of Finance.
(2)The Department of Finance shall make a determination whether to approve or deny a request made pursuant to paragraph (1) if the design-build project requested will not exceed the five facilities maximum set forth in this section and Section 14661.1.
(3)After receiving notification that the Department of Finance has approved the request and that the Legislature has appropriated funds for a specific project, the Judicial Council may enter into a design-build contract under this section.
(j)Nothing in this section is intended to affect, expand, alter, or limit any rights or remedies otherwise available under the law.
(1)The Chico Courthouse located at 655 Oleander Avenue in the City of Chico, County of Butte, Assessor Parcel Number 003-180-004.
(2)The Corning Courthouse located at 720 Hoag Street in the City of Corning, County of Tehama, Assessor Parcel Number 071-121-01-1.
(3)
(4)The Firebaugh Courthouse located at 1325 O Street in the City of Firebaugh, County of Fresno, Assessor Parcel Numbers 008-131-08T and 008-130-09T.
(5)
(6)
(7)The Corcoran Courthouse located at 1000 Chittenden Avenue in the City of Corcoran, County of Kings, Assessor Parcel Number 030-213-008.
(d)One hundred seventy dollars ($170) of each three hundred fifty-five dollar ($355) fee collected under this section shall be transmitted to the Controller for deposit into the Immediate and Critical Needs Account of the State Court Facilities Construction Fund, established in Section 70371.5.
It is the intent of the Legislature to enact statutory changes, relating to the Budget Act of 2021.